| 12-18-2005 | The Flywheel counter incremented to #496 at 12:57:33z (2005:350). |
| 12-10-2005 | A PREXTCALA command request was done at 04:47:53z bin #70 (2005:344). |
| 12-09-2005 | A PREXTCALA command request was done at 05:43:11z bin #66 (2005:343). |
| 12-08-2005 | Two PREXTCALA command requests were done at 05:00:52z bin #39 and 06:38:31z bin #45 (2005:342). |
| 12-03-2005 | The Monthly Status Review (MSR) was cancelled for the month of December. |
| 12-03-2005 | The UTCF was adjusted by -885.0 µs at 22:56:20z. The new UTCF value is 31535996. 741413 seconds. The current drift value is –46.0 µs. The Frequency Standard is x’856’ with a drift rate of –1.84 µs/hr (2005:337). |
| 11-27-2005 | A 180 degree yaw maneuver (#127) was performed at 19:36:24z. TRMM is flying in the -X Forward direction as of (2005:331). The next Yaw maneuver to +X Forward direction is currently scheduled for December 30, 2005 (05-364). |
| 11-27-2005 | Two VIRS solar calibrations were performed at 06:16:58z - 06:18:58z and 09:21:58z – 09:23:58z. |
| 11-12-2005 | A 180 degree yaw maneuver (#126) was performed at 06:29:24z.. TRMM is flying in the +X Forward direction as of (2005:316). The next Yaw maneuver to -X Forward direction is currently scheduled for November 27, 2005 (05-331). |
| 11-11-2005 | The UTCF was adjusted by -898.0 µs at 23:40:49z. The new UTCF value is 31535996.742298 seconds (2005:315). |
| 11-09-2005 | The Monthly Status Review (MSR) was cancelled for the month of November. |
| 11-09-2005 | The next TRMM Configuration Control Board (CCB) is scheduled for January 10, 2006 (2006:010). |
| 11-04-2005 | The Flywheel counter incremented to #495 at 20:23:16z. (2005:308). |
| 10-02-2005 | The next TRMM Configuration Control Board (CCB) is scheduled for November 09, 2005 (2005:313). |
| 10-31-2005 | The Flywheel counter incremented to #494 at 11:36:15z. (2005:304). |
| 10-26-2005 | The Flywheel counter incremented to #493 at 18:53:24z. (2005:299). |
| 10-21-2005 | A PR LNA ANAYLIS was performed at 04:14:00z. (2005:294). |
| 10-14-2005 | A 180 degree yaw maneuver (#125) was performed at 10:08:24z. TRMM is flying in the -X Forward direction as of (2005:287). The next Yaw maneuver to +X Forward direction is currently scheduled for November 12, 2005 (05-316). |
| 10-02-2005 | The Monthly Status Review (MSR) was cancelled for the month of October. |
| 09-28-2005 | The Science Mission Directorate has accepted the Tropical Rainfall Measuring Mission (TRMM) Mission Extension Plan submitted by the Earth Science Mission Operations Project on July 29, 2005. Approval is thereby granted to extend TRMM science operations through FY 2009. Further extension may be considered at the end of that period by the Earth Science Senior Review process with even the potential of overlap with the forthcoming (2010) Global Precipitation Measurement (GPM) mission. |
| 09-28-2005 | The next TRMM Configuration Control Board (CCB) is scheduled for November 02, 2005 (05:306). |
| 09-23-2005 | The UTCF was adjusted by -841.0 µs 23:19:52z. The new UTCF value is 31535996.744105 seconds. (2005:256). |
| 09-22-2005 | A 180 degree yaw maneuver (#124) was performed at 01:34:52. TRMM is flying in the +X Forward direction as of (2005:265). The next Yaw maneuver to -X Forward direction is currently scheduled for October 14, 2005 (05-287). |
| 09-13-2005 | The UTCF was adjusted by -864.0 µs 23:02:55z. The new UTCF value is 31535996.744946 seconds (2005:256). |
| 09-07-2005 | The Monthly Status Review (MSR) was cancelled for the month of September. |
| 09-02-2005 | TRMM had a scheduled clock adjust of -894.0 µsec. The operator commanded a positive adjust of 894.0 µsec (2005:245). |
| 09-02-2005 | Two VIRS solar calibrations were performed at 05:02:58z - 05:04:58z and 08:07:52z – 08:09:52z. (2005:245). |
| 09-01-2005 | The Flywheel counter incremented to #489 at 22:45:37z. (2005:244). |
| 08-31-2005 | The Flywheel counter incremented to #488 at 15:27:45z. (2005:243). |
| 08-31-2005 | The new data storage filter table reallocating recorder space to VR1 was loaded to the S/C. This filter table was generated for ‘Lights Out’ operations and is partitioned to give 10 hours of recorder space on VR1 with an equally distributed loss of 10 minutes to each of the remaining VRs(2005:243). |
| 08-30-2005 | A 180 degree yaw maneuver (#123) was performed at 20:06:27. TRMM is flying in the -X Forward direction as of (2005:242). The next Yaw maneuver to +X Forward direction is currently scheduled for September 22, 2005 (2005:265). |
| 08-22-2005 | The UTCF was adjusted by -874.0 µs 23:44:10z. The new UTCF value is 31535996. 747614 seconds. The current drift value is –295.0 µs. The Frequency Standard is x’84A’ with a drift rate of –2.36 µs/hr (2005:234). |
| 08-15-2005 | A PR LNA ANAYLIS was performed at 13:53:00z (2005:227). |
| 08-10-2005 | The UTCF was adjusted by -861.0 µs at 23:11:49z. The new UTCF value is 31535996.747594 seconds. The current drift value is –287.0 µs. The Frequency Standard is x’84A’ with a drift rate of –2.87 µs/hr (2005:222). |
| 08-10-2005 | The Monthly Status Review (MSR) was cancelled for the month of August. |
| 08-10-2005 | The next TRMM Configuration Control Board (CCB) is scheduled for September 28, 2005 (05:222). |
| 08-04-2005 | The Flywheel counter incremented to #487 at 12:36:42z. (2005:216). |
| 08-03-2005 | Two VIRS solar calibrations were performed at 07:06:24z - 07:06:24z and 10:11:22z – 10:13:22z. (2005:215). |
| 08-01-2005 | A 180 degree yaw maneuver (#122) was performed at 14:29:00. TRMM is flying in the +X Forward direction as of (2005:213). The next Yaw maneuver to -X Forward direction is currently scheduled for August 31, 2005 (2005:243). |
| 08-01-2005 | The Flywheel counter incremented to #486 at 03:10:30z. (2005:213). |
| 07-29-2005 | The UTCF was adjusted by -823.0 µs at 22:44:09z. The new UTCF value is 31535996.748455 seconds. The current drift value is –212.0 µs. The Frequency Standard is x’84A’ with a drift rate of –3.09 µs/hr (2005:210). |
| 07-27-2005 | The Flywheel counter incremented to #485 at 13:28:35z. (2005:208). |
| 07-25-2005 | The VIRS instrument reset itself at 03:21:07z, the VIRS reset procedure was run and the instrument was back to nominal (2005:206). |
| 07-24-2005 | A PR command request was preformed at 01:25:00 (2005:205). |
| 07-20-2005 | The Monthly Status Review (MSR) was cancelled for the month of July. |
| 07-19-2005 | Two VIRS solar calibrations were performed at 05:43:20z and 10:20:48z. (2005:200). |
| 07-17-2005 | The UTCF was adjusted by -913.0 µs at 23:42:39z. The new UTCF value is 31535996.749278 seconds. The Frequency Standard is x’84A’. Since the clock adjust was done at the end of this weekly period, there is no current drift value or drift rate (2005:198). |
| 07-17-2005 | The next TRMM Configuration Control Board (CCB) is scheduled for August 10, 2005 (05:222). |
| 07-15-2005 | A 180 degree yaw maneuver (#121) was performed at 01:23:37. TRMM is flying in the -X Forward direction as of (2005:196). The next Yaw maneuver to +X Forward direction is currently scheduled for August 01, 2005 (2005:213). |
| 07-05-2005 | The Flywheel counter incremented to #484 at 12:35:00z. (2005:186). |
| 06-24-2005 | The Flywheel counter incremented to #482 at 17:21:00z. (2005:175). |
| 06-20-2005 | A PR LNA Analysis was performed at 18:15:00z. (2005:171). |
| 06-15-2005 | The UTCF was adjusted by -821.0 µs at 22:46z. The new UTCF value is 31535996.750191 seconds. The current drift value is –94.0µs. The Frequency Standard is x’84A’ with a drift rate of –0.9991 µs/hr (2005:166). |
| 06-14-2005 | A 180 degree yaw maneuver (#120) was performed. TRMM is flying in the +X Forward direction as of (2005:165). The next Yaw maneuver to -X Forward direction is currently scheduled for July 17, 2005 (2005:198). |
| 06-08-2005 | The Monthly Status Review (MSR) was cancelled for the month of June. |
| 06-08-2005 | The next TRMM Configuration Control Board (CCB) is scheduled for July 26, 2005 (05:207). |
| 06-01-2005 | The UTCF was adjusted by -867.0 µs at 23:43:58z. The new UTCF value is 31535996.75012 seconds. The current drift value is –519.0µs. The Frequency Standard is x’84A’ with a drift rate of –2.45 µs/hr (2005:152). |
| 05-31-2005 | A 180 degree yaw maneuver (#119) was performed. TRMM is flying in the -X Forward direction as of (2005:151). The next Yaw maneuver is currently scheduled for June 14, 2005 (2005:165). |
| 05-29-2005 | Two VIRS solar calibrations were performed at 06:05:16z - 06:07:56z and 10:42:40z – 10:45:20z. (2005:149). |
| 05-23-2005 | The Flywheel counter incremented to #479 at 07:26:00z. (2005:143). |
| 05-16-2005 | The UTCF was adjusted by -858.0 µs at 23:58:31z. The new UTCF value is 31535996.751879 seconds. The current drift value is –293.0µs. The Frequency Standard is x’84A’ with a drift rate of –2.15 µs/hr (2005:136). |
| 05-16-2005 | The Flywheel counter incremented to #478 at 14:31:00z. (2005:136). |
| 05-12-2005 | The Flywheel counter incremented to #477 at 01:12:00z. (2005:132). |
| 05-11-2005 | The Flywheel counter incremented to #476 at 15:33:00z. (2005:131). |
| 05-09-2005 | The TRMM Monthly Status Review (MSR) was cancelled for the month of May. |
| 05-03-2005 | The VIRS instrument reset itself at 17:01:12z, the VIRS reset procedure was run and at 17:03:20z the VIRS instrument was back to nominal (2005:123). |
| 04-30-2005 | A 180 degree yaw maneuver (#118) was performed. TRMM is flying in the +X Forward direction as of (2005:120). The next Yaw maneuver is currently scheduled for May 31, 2005 (2005:151). |
| 04-28-2005 | The UTCF was adjusted by -728.0 µs at 23:02:45z. The new UTCF value is 31535996.752737 seconds. The current drift value is –166.0µs. The Frequency Standard is x’84A’ with a drift rate of –2.35 µs/hr (2005:118). |
| 04-22-2005 | A PR LNA Analysis was performed at 00:41:00z. (2005:112). |
| 04-21-2005 | The Flywheel counter incremented to #475 at 14:31:00z. (2005:111). |
| 04-15-2005 | The Flywheel counter incremented to #474 at 13:43:00z. (2005:105). |
| 04-13-2005 | The Flywheel counter incremented to #473 at 03:31:00z. (2005:103). |
| 04-13-2005 | The next TRMM Configuration Control Board (CCB) is scheduled for June 8th (05:159). |
| 04-13-2005 | Two VIRS solar calibrations were performed at 06:16:32-06:19:12z and 09:21:34-09:24:14z (2005:103). |
| 04-12-2005 | The UTCF was adjusted by -891.6 µs at 23:12:34z. The new UTCF value is 31535996.753465 seconds. The current drift value is –251.6 µs. The Frequency Standard is x’84A’ with a drift rate of –1.80 µs/hr (2005:102). |
| 04-11-2005 | The TRMM Monthly Status Review (MSR) was cancelled for the month of April. |
| 04-10-2005 | A 180 degree yaw maneuver (#117) was performed. TRMM is flying in the -X Forward direction as of (2005:100). The next Yaw maneuver is scheduled for April 30, 2005 (2005:120). |
| 03-27-2005 | The Flywheel counter incremented to #471 at 12:16:00z. (2005:086). |
| 03-21-2005 | The UTCF was adjusted by -838.0 µs at 23:55:13z. The new UTCF value is 31535996.754357 seconds. The current drift value is –220.0µs. The Frequency Standard is x’84A’ with a drift rate of –1.59 µs/hr (2005:080). |
| 03-19-2005 | A PR LNAANALYSIS command request performed at 17:30:00z (2005:078). |
| 03-17-2005 | Two VIRS solar calibrations were performed at 06:27:08-06:29:08z and 09:32:04-09:34:04z (2005:076). |
| 03-16-2005 | A 180 degree yaw maneuver (#116) was performed. TRMM is flying in the +X Forward direction as of 09:51:04z (2005:075). The next Yaw maneuver is scheduled for April 10, 2005 (2005:100). |
| 03-14-2005 | The TRMM Monthly Status Review (MSR) was cancelled for the month of March. |
| 03-03-2005 | TDE was relocated and a new TDRS was moved into the TDE spot. Before uplinking a new vector for TDE, the onboard continuity check was disabled. After successful propagation, the continuity check was re-enabled. |
| 03-01-2005 | The next TRMM Configuration Control Board (CCB) is scheduled for April 13th (05:103). |
| 02-24-2005 | At 22:43:13z a UTCF Adjustment was performed and the UCTF was adjusted by -896.0 (2005:054). |
| 02-21-2005 | A PR LNAANALYSIS command request was performed at 07:05:00z (2004:052). |
| 02-17-2005 | A 180 degree yaw maneuver (#115) was performed. TRMM is flying in the -X Forward direction as of 00:23:32z (2005:048). The next Yaw maneuver is scheduled for March 16, 2005 (2005:075). |
| 02-16-2005 | The next TRMM Configuration Control Board (CCB) is scheduled for March 01, 2005 (2005:060). |
| 02-12-2005 | The Flywheel counter incremented to #470 at 12:16:00z. (2005:043). |
| 02-11-2005 | The Flywheel counter incremented to #469 at 06:52:00z. (2005:042). |
| 02-10-2005 | The Flywheel counter incremented to #468 at 15:45:00z. (2005:041). |
| 02-02-2005 | The Flywheel counter incremented to #467 at 06:03:00z. (2005:033). |
| 01-31-2005 | A 180 degree yaw maneuver (#114) was performed. TRMM is flying in the +X Forward direction as of 00:23:32z (2005:031). The next Yaw maneuver is scheduled for February 17, 2005 (2005:048). |
| 01-29-2005 | The TRMM Monthly Status Review (MSR) is cancelled for the month of February. |
| 01-29-2005 | The Flywheel counter incremented to #465 at 07:24:00z and to #466 at 18:33:00z (2005:029). |
| 01-29-2005 | Two VIRS solar calibrations were performed at 06:40:40-06:43:20z and 09:45:44-09:48:24z respectively (2005:029). |
| 01-27-2005 | At 23:12:59z a UTCF Adjustment was performed and the UCTF was adjusted by -933 (2005:027). |
| 01-27-2005 | The Flywheel counter incremented to #464 at 05:03:00z. (2005:027). |
| 01-27-2005 | The next TRMM Configuration Control Board (CCB) is scheduled for February 16, 2005 (2005:047). |
| 01-22-2005 | A PR LNAANALYSIS command request was performed at 21:50:00z (2005:022). |
| 01-16-2005 | The Flywheel counter incremented to #462 at 20:06:00z. (2005:016). |
| 01-03-2005 | The TRMM Monthly Status Review (MSR) is cancelled for the month of January. |
| 01-02-2005 | The Flywheel counter incremented to #460 at 20:06:00z. (2005:002). |
| 2003 News |
2002 News |
2001 News |
2000 News |
1999 News |
1998 News |
1997 News |
Top of page |
|
| 2004 |
| 12-30-2004 | A 180 degree yaw maneuver (#113) was performed. TRMM is flying in the -X Forward direction as of 05:05:28z (2004:365). The next Yaw maneuver is scheduled for January 31, 2005 (2005:031). |
| 11-29-2004 | The Flywheel counter incremented to #459 at 07:10:00z. (2004:364). |
| 11-27-2004 | The Flywheel counter incremented to #458 at 19:35:00z. (2004:362). |
| 12-24-2004 | A PR LNAANALYSIS command request was performed at 12:35:00z (2004:359). |
| 12-18-2004 | Two VIRS solar calibrations were performed at 08:24:44z-08:26:44z and 11:29:44z-11:31:44z respectively (2004:353). |
| 12-16-2004 | A 180 degree yaw maneuver (#112) was performed. TRMM is flying in the +X Forward direction as of 15:50:02z (2004:351). The next Yaw maneuver is scheduled for December 30, 2004 (2004:365). |
| 12-15-2004 | The Flywheel counter incremented to #457 at 07:59:00z (2004:350). |
| 12-13-2004 | ECLIPSE ground system front ends, work stations, and GMSEC equipment have been installed in the MOC. Procedure and page development is well underway. Eclipse Build 1.01 was delivered and installed in the MOC the week of November 15th. DRs are being written as they occur. During weekdays, Eclipse is used to command the S/C for approximately four passes. Noops, manual playbacks of data, and data releases are performed. Eclipse is used to shadow events on nights and weekends. |
| 12-06-2004 | At 23:51:52z a UTCF Adjustment was performed and the UCTF was adjusted by -972.6 (2004:341). |
| 12-02-2004 | The next TRMM Configuration Control Board (CCB) is scheduled for January 27, 2005 (2005:027). |
| 11-28-2004 | The TRMM Monthly Status Review (MSR) is cancelled for the month of December. |
| 11-26-2004 | The Flywheel counter incremented to #456 at 21:43:00z. (2004:331). |
| 11-25-2004 | A PR LNAANALYSIS command request was performed at 03:19:00z (2004:330). |
| 11-23-2004 | At 22:45:51z a UTCF Adjustment was performed and the UCTF was adjusted by -930.4 (2004:328). |
| 11-22-2004 | The Flywheel counter incremented to #455 at 09:30:00z (2004:327). |
| 11-14-2004 | A 180 degree yaw maneuver (#111) was performed. TRMM is flying in the -X Forward direction as of 15:50:02z (2004:319). The next Yaw maneuver is scheduled for December 16, 2004 (2004:351). |
| 11-12-2004 | The Flywheel counter incremented to #454 at 12:08:00z (2004:317). |
| 11-07-2004 | At 23:15:50z a UTCF Adjustment was performed and the UCTF was adjusted by -924.0 (2004:312). |
| 11-06-2004 | The Flywheel counter incremented to #453 at 22:30:00z. (2004:310). |
| 11-05-2004 | The Flywheel counter incremented to #452 at 07:21:05z (2004:310). |
| 10-30-2004 | The TRMM Monthly Status Review (MSR) is cancelled for the month of November. |
| 10-30-2004 | Two VIRS solar calibrations were performed at 04:49:32z-04:51:32z and 09:27:04z-09:29:04z respectively (2004:304). |
| 10-28-2004 | A 180 degree yaw maneuver (#110) was performed. TRMM is flying in the +X Forward direction as of 09:06:34z. (2004:302). The next Yaw maneuver is scheduled for November 14, 2004 (2004:319). |
| 10-15-2004 | The Flywheel counter incremented to #451 at 13:36:00z. (2004:289). |
| 10-06-2004 | The next TRMM Configuration Control Board (CCB) is scheduled for December 02, 2004 (2004:307). |
| 10-01-2004 | A 180 degree yaw maneuver (#109) was performed. TRMM is flying in the -X Forward direction as of 06:24:06z. (2004:275). The next Yaw maneuver is scheduled for October 28, 2004 (2004:302). |
| 09-30-2004 | The Flywheel counter incremented to #450 at 09:34:00z. (2004:274). |
| 09-27-2004 | The TRMM Monthly Status Review (MSR) is cancelled for the month of October. |
| 09-26-2004 | The next TRMM Configuration Control Board (CCB) is scheduled for October 06, 2004 (2004:280). |
| 09-19-2004 | A PR External Calibration [Beam=43] was performed at 15:35:50z.(2004:263). |
| 09-18-2004 | PR External Calibrations [Beam=56 & 67] were performed at 14:53:39 & 16:31:38z respectively(2004:262). |
| 09-17-2004 | A PR External Calibration [Beam=37] was performed at 15:49:05z(2004:261). |
| 09-10-2004 | The Flywheel counter incremented to #449 at 20:45:00z (2004:254). |
| 09-08-2004 | Two VIRS solar calibrations were performed (#1) at 05:24:08z and (#2) at 10:01:36z respectively (2004:252). |
| 09-06-2004 | The TRMM Monthly Status Review (MSR) is cancelled for the month of September. |
| 09-06-2004 | The next TRMM Configuration Control Board (CCB) is scheduled for September 29, 2004 (04:273). |
| 09-06-2004 | A 180 degree yaw maneuver (#108) was performed. TRMM is flying in the +X Forward direction as of 18:56:31z (2004:250). The next Yaw maneuver is scheduled for October 01, 2004 (2004:275). |
| 08-27-2004 | The Flywheel counter incremented to #448 at 10:45:26z (2004:240). |
| 08-27-2004 | The Flywheel counter incremented to #447 at 17:46:46z (2004:240). |
| 08-27-2004 | The Flywheel counter incremented to #446 at 06:40:36z (2004:240). |
| 08-24-2004 | The Flywheel counter incremented to #445 at 19:58:23z (2004:237). |
| 08-24-2004 | The Flywheel counter incremented to #444 at 00:12:03z (2004:237). |
| 08-17-2004 | At 23:16:55z a UTCF Adjustment was performed and the UCTF was adjusted by -949.0 (2004:230). |
| 08-17-2004 | A 180 degree yaw maneuver (#107) was performed. TRMM is flying in the -X Forward direction as of 14:48:12z (2004:230). The next Yaw maneuver is scheduled for September 06, 2004 (2004:250). |
| 08-17-2004 | The TRMM Monthly Status Review (MSR) is cancelled for the month of August. |
| 08-16-2004 | Two VIRS solar calibrations were performed (#1) at 05:26:44z and (#2) at 08:31:40z respectively (2004:229). |
| 08-11-2004 | The next TRMM Configuration Control Board (CCB) is scheduled for August 25, 2004 (2004:238). |
| 08-11-2004 | The Flywheel counter incremented to #443 at 05:41:00z (2004:224). |
| 08-07-2004 | The Flywheel counter incremented to #442 at 01:10:36z. (2004:221). |
| 08-07-2004 | At 22:58:58z a UTCF Adjustment was performed and the UCTF was adjusted by -915.1 ms (2004:220). |
| 08-07-2004 | The Flywheel counter incremented to #441 at 20:06:26z (2004:220). |
| 07-26-2004 | The next TRMM Configuration Control Board (CCB) has not been scheduled. |
| 07-20-2004 | The Flywheel counter incremented to #437 at 05:14:00z (2004:202). |
| 07-17-2004 | A 180 degree yaw maneuver (#106) was performed. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for August 17, 2004 (2004:230). |
| 07-17-2004 | At 23:53:47z a UTCF Adjustment was performed and the UCTF was adjusted by -900.0 ms. |
| 07-03-2004 | A 180 degree yaw maneuver (#105) was performed at 12:49:46. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for July 18, 2004 (2004:200). |
| 07-02-2004 | Two VIRS solar calibrations were performed (#1) at 06:33:16Z and (#2) at 09:38:12Z respectively. |
| 06-30-2004 | The Flywheel counter incremented to #435 at 04:25:00z (2004:182). |
| 06-27-2004 | A PR LNAANALYSIS was performed at 07:38:00z (2004:179). |
| 06-24-2004 | At 23:05:47z a UTCF Adjustment was performed and the UCTF was adjusted by -880.5 ms. |
| 06-22-2004 | The Flywheel counter incremented to #434 at 14:11:00z (2004:174). |
| 06-11-2004 | The Flywheel counter incremented to #433 at 10:58:55z (2004:163). |
| 06-09-2004 | At 23:42:50z a UTCF Adjustment was performed and the UCTF was adjusted by -904.4 ms. |
| 06-02-2004 | A TRMM Monthly Status Review (MSR) is cancelled for the month of July. |
| 06-02-2004 | The next TRMM Configuration Control Board (CCB) is scheduled for July 26th (04-154). |
| 05-31-2004 | A 180 degree yaw maneuver (#104) was performed at 18:05:38z. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for July 03, 2004 (2004:185). |
| 05-11-2004 | At 22:48:29z a UTCF Adjustment was performed and the UCTF was adjusted by -849.0 ms. |
| 05-19-2004 | The Flywheel counter incremented to #430 at 02:40z (2004:140). |
| 05-18-2004 | A VIRS solar calibration was performed at 09:39:06z-09:41:06z (2004:139). |
| 05-17-2004 | A PR LNAANALYSIS was performed at 01:02z (2004:138). |
| 05-16-2004 | A 180 degree yaw maneuver (#103) was performed at 18:01:38z. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for May 31, 2004 (2004:152). |
| 05-11-2004 | At 23:22:27z a UTCF Adjustment was performed and the UCTF was adjusted by -906.0 ms. |
| 04-30-2004 | At 23:10:41z a UTCF Adjustment was performed and the UCTF was adjusted by -917.0 ms. |
| 04-27-2004 | The next TRMM Configuration Control Board (CCB) is scheduled for June 02, 2004 (2004:154). |
| 04-25-2004 | A PREXTCALA was performed at 17:50:14z (bin #36) (2004:116). |
| 04-24-2004 | Two PREXTCALA were performed at 17:07:56z (bin #71) and 18:45:35z (bin #53) (2004:115). |
| 04-23-2004 | A PREXTCALA was performed at 18:03:21z (bin #45) (2004:114). |
| 04-18-2004 | A TRMM Monthly Status Review (MSR) is canceled for the month of May. |
| 04-18-2004 | At 23:00:17z a UTCF Adjustment was performed and the UCTF was adjusted by -855.5 ms. |
| 04-18-2004 | The Flywheel counter incremented to #429 at 21:08:54z (2004:109). |
| 04-18-2004 | Two VIRS solar calibrations were performed (#1) at 05:32:38z and (#2) at 08:37:36z respectively. |
| 04-16-2004 | A 180 degree yaw maneuver (#102) was performed at 19:05:14z. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for May 16, 2004 (04-137). |
| 04-07-2004 | At 22:27:19z a UTCF Adjustment was performed and the UCTF was adjusted by -860.0 ms. |
| 04-03-2004 | A TRMM Monthly Status Review (MSR) is scheduled for May 03, 2004 (2004:124). |
| 03-26-2004 | The next Configuration Control Board (CCB) is scheduled for April 27, 2004 (2004:118). |
| 03-26-2004 | A 180 degree yaw maneuver (#101) was performed at 09:39:25z. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for April 16, 2004 (04-107). |
| 03-24-2004 | At 23:09:25z a UTCF Adjustment was performed and the UCTF was adjusted by -889.5 ms. |
| 03-24-2004 | Two VIRS Solar Calibrations were performed at 05:47:22z and 08:52:20z respectively (2004:084). |
| 03-15-2004 | The next TRMM Monthly Status Review (MSR) for March is scheduled for April 05, 2004 (2004:096). |
| 03-12-2004 | The Flywheel counter incremented to #428 at 10:11:00z (2004:072). |
| 03-04-2004 | A Monthly Status Review (MSR) for March is currently not scheduled. |
| 03-04-2004 | The Flywheel counter incremented to #427 at 14:08:00z (2004:064). |
| 03-03-2004 | A 180 degree yaw maneuver (#100) was performed at 08:16:13. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for March 26, 2004 (04-086). |
| 03-01-2004 | The next TRMM Monthly Status Review (MSR) for March is scheduled for March 08, 2004 (2004:068). |
| 02-29-2004 | PR External Calibration [Beam=67] was performed at 22:10:40z. (2004:060). |
| 02-28-2004 | PR External Calibration [Beam=38 & 47] was performed at 21:28:47 & 23:04:24z respectively. (2004:059). |
| 02-27-2004 | PR External Calibration [Beam=62] was performed at 22:24:28z. (2004:058). |
| 02-23-2004 | The next TRMM Configuration Control Board (CCB) is scheduled for March 23, 2003 (2004:083). |
| 02-14-2004 | At 23:11:45z a UTCF Adjustment was performed and the UCTF was adjusted by -861.0 ms. |
| 02-13-2004 | The Flywheel counter incremented to #426 at 11:16:00z. |
| 02-09-2004 | The next TRMM Monthly Status Review (MSR) for March is scheduled for March 01, 2004 (2004:061). |
| 02-08-2004 | The Flywheel counter incremented to #425 at 17:41:53z. |
| 02-04-2004 | A 180 degree yaw maneuver (#99) was performed at 00:06:11. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for March 03, 2004 (04-063). |
| 02-01-2004 | The Flywheel counter incremented to #424 at 21:04:00z. |
| 01-27-2004 | The Flywheel counter incremented to #423 at 09:20:00z. |
| 01-27-2004 | The Flywheel counter incremented to #422 at 01:56:00z. |
| 01-20-2004 | Two VIRS solar calibrations were performed (#1) at 04:30:16z - 04:32:56z and (#2) at 06:02:46z - 06:05:26z. |
| 01-18-2004 | A 180 degree yaw maneuver (#98) was performed at 22:40:00. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for February 04, 2004 (04-035). |
| 01-16-2004 | A PR LNAANALYSIS was performed at 14:05:00z. |
| 01-16-2004 | The Flywheel counter incremented to #421 at 03:49:00z. |
| 01-13-2004 | The next TRMM Configuration Control Board (CCB) is scheduled for February 23, 2004 (2004-054). |
| 01-12-2004 | The next TRMM Monthly Status Review (MSR) for February is scheduled for February 09, 2004 (2004:040). |
| 01-12-2004 | At 22:32:37z a UTCF Adjustment was performed and the UCTF was adjusted by -869.0 ms. |
| 01-09-2004 | The Flywheel counter incremented to 420 at 17:42:00z. |
| 01-07-2004 | The Flywheel counter incremented to 419 at 09:59:00z. |
| 01-05-2004 | AutoFDS was made operational on January 05, 2004 and will generate all scheduling, maneuver, and attitude products. AutoFDS will replace the current Flight Dynamics System (FDS) located in Building 28. FDF in Building 28 has stopped generating scheduling, maneuver, and attitude products for TRMM. |
| 01-02-2004 | At 23:35:40z a UTCF Adjustment was performed and the UCTF was adjusted by -924.0 ms. |
| 2002 News |
2001 News |
2000 News |
1999 News |
1998 News |
1997 News |
Top of page |
|
| 2003 |
| 12-30-2003 | The Flywheel counter incremented to 418 at 16:37:00z. |
| 12-22-2003 | The next TRMM Monthly Status Review (MSR) for January is scheduled for January 12, 2004 (2004:012). |
| 12-21-2003 | At 23:29:18z a UTCF Adjustment was performed and the UCTF was adjusted by -916.0 ms. |
| 12-21-2003 | The Flywheel counter incremented to 417 at 04:59:00z. |
| 12-17-2003 | A 180 degree yaw maneuver (#97) was performed at 10:23:32. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for January 18, 2004 (04-018). |
| 12-15-2003 | A PR LNAANALYSIS was performed at 05:55:00z - 06:00:00z. |
| 12-09-2003 | At 23:03:16z a UTCF Adjustment was performed and the UCTF was adjusted by -962.0 ms. |
| 12-07-2003 | The Flywheel counter incremented to 416 at 07:21:00z. |
| 12-05-2003 | Two VIRS solar calibrations were performed (#1) at 18:19:38z - 18:22:18z and (#2) at 21:24:36z - 21:26:12z. |
| 12-05-2003 | The Flywheel counter incremented to 415 at 09:31:00z. |
| 12-04-2003 | The Flywheel counter incremented to 414 at 19:21:00z. |
| 12-03-2003 | The next TRMM Configuration Control Board (CCB) is scheduled for January 13, 2003 (04-013). |
| 12-03-2003 | A 180 degree yaw maneuver (#96) was performed at 14:54:46. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for December 17, 2003 (03-351). |
| 12-01-2003 | The next TRMM Monthly Status Review (MSR) for January is not currently scheduled. |
| 10-26-2003 | The Flywheel counter incremented to 413 at 23:22:00z. |
| 11-25-2003 | At 23:43:44z a UTCF Adjustment was performed and the UCTF was adjusted by -863.0 ms. |
| 11-24-2003 | A PR External Calibration (bin #31) was performed at 00:26:10z. |
| 11-23-2003 | A PR External Calibration (bin #52) was performed at 22:48:28z. |
| 11-22-2003 | A PR External Calibration (bin #69) was performed at 00:39:44z and a second one (bin #68) was performed at 23:44:05z. |
| 11-10-2003 | At 23:28:49z a UTCF Adjustment was performed and the UCTF was adjusted by -888.4 ms. |
| 11-10-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for December 01, 2003 (03-335). |
| 11-08-2003 | VIRS reset itself at 04:42:26z. The instrument was re-configured on the 05:24z event. |
| 11-04-2003 | Two VIRS Solar Calibrations were performed: (#1) at 06:06:26z - 06:09:06z , and (#2) at 09:11:26z - 09:14:06z. |
| 11-03-2003 | On Monday November 3, 2003 AutoFDS successfully generated daily products and the MOC system was able to successfully process them. Weekly products from AutoFDS were successful during the week of 03-307 (November 3rd). AutoFDS also successfully generated its first Delta-V (#448). FDF remains as backup and a failover can be performed without problem. |
| 11-03-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for November 10, 2003 (03-314). |
| 11-03-2003 | LIS powered ON starting at 17:02:00z. |
| 11-02-2003 | A 180 degree yaw maneuver (#95) was performed at 15:39:20. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for December 03, 2003 (03-337). |
| 10-29-2003 | Due to the Proton Storm, MSFC requested that LIS be powered OFF. The LIS power relay was opened at 13:44:35z. |
| 10-29-2003 | AutoFDS successfully generated daily products and the MOC system was able to successfully process them. Weekly products from AutoFDS will be used the week of 03-307 (November 2nd). AutoFDS also generated successfully its first Delta-V (#448). FDF will remain as backup and a failover can be performed without any problem. |
| 10-27-2003 | The Flywheel counter incremented to 412 at 09:15:00z. |
| 10-23-2003 | A PRLNAANALYSIS was performed at 09:05:00z - 09:10:00z. |
| 10-23-2003 | Auto FDS will go prime with daily products on Wednesday October 29, 2003. Weekly products scheduled to be prime next week. FDF will remain as backup and a failover can be performed without any problem. |
| 10-22-2003 | The next TRMM Configuration Control Board (CCB) is scheduled for December 03, 2003 (03-337). |
| 10-14-2003 | A 180 degree yaw maneuver (#94) was performed at 07:34:50. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for November 02, 2003 (03-306). |
| 10-13-2003 | At 23:11:01z a UTCF Adjustment was performed and the UCTF was adjusted by -926.0 ms. |
| 10-13-2003 | The Flywheel counter incremented to 411 at 21:37:00z. |
| 10-11-2003 | The Flywheel counter incremented to 410 at 23:12:00z. |
| 10-09-2003 | The Flywheel counter incremented to 409 at 12:35:00z. |
| 10-06-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for November 03, 2003 (03-307). |
| 09-23-2003 | At 23:57:03z a UTCF Adjustment was performed and the UCTF was adjusted by -878.5 ms. |
| 09-23-2003 | The Flywheel counter incremented to 408 at 05:32:49z. |
| 09-21-2003 | Two VIRS Solar Calibrations were performed: (#1) at at 04:22:32z - 04:25:12z , and (#2) at 05:54:58z - 05:57:38z. |
| 09-19-2003 | A 180 degree yaw maneuver (#93) was performed at 03:08:38. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for October 14, 2003 (03-287). |
| 09-19-2003 | A PRLNAANALYSIS was performed at 02:50:00z - 02:55:00z. |
| 09-19-2003 | The Flywheel counter incremented to 407 at 00:55:34z. |
| 09-17-2003 | The next TRMM Configuration Control Board (CCB) is scheduled for October 22, 2003 (03-295). |
| 09-08-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for October 06, 2003 (03-279). |
| 08-29-2003 | At 23:58:30z a UTCF Adjustment was performed and the UCTF was adjusted by -902.0 ms. |
| 08-23-2003 | A 180 degree yaw maneuver (#92) was performed at 15:51:29. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for September 19, 2003 (03-262). |
| 08-19-2003 | The Flywheel counter incremented to 406 at 15:43:00z. |
| 08-16-2003 | The Flywheel counter incremented to 405 at 15:05:00z. |
| 08-07-2003 | The Flywheel counter incremented to 404 at 23:13:00z. |
| 08-07-2003 | The next TRMM Configuration Control Board (CCB) is scheduled for September 17, 2003 (03-260). |
| 08-05-2003 | A 180 degree yaw maneuver (#91) was performed at 11:31:33. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for August 23, 2003 (03-235). |
| 08-04-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for September 08, 2003 (03-251). |
| 08-04-2003 | Two VIRS Solar Calibrations were performed: #1 at 06:47:30z - 06:50:10z, and #2 at 08:20:00z - 08:22:40z. |
| 08-03-2002 | A PR External Calibration was performed at 08:25:48z. |
| 08-02-2002 | A PR External Calibration was performed at 09:21:30z. |
| 08-01-2002 | A PR External Calibration was performed at 10:17:08z. |
| 07-30-2003 | The Flywheel counter incremented to 403 at 07:11:00z. |
| 07-22-2003 | The +Y Solar Array offset test was performed. The +Y SA was set to track with a 55° offset while the -Y remained parked for about two orbits. Following the testing, the SA was returned to nominal ±50° tracking. |
| 07-19-2003 | At 23:05:55z a Frequency Standard Adjustment was also performed, and the FS was adjusted by 12 counts. The new Frequency Standard is x’81A’ with a drift rate of -0.33 ms/hr. |
| 07-19-2003 | At 23:04:40z a UTCF Adjustment was performed and the UCTF was adjusted by -890.0 ms. |
| 07-18-2003 | A PRLNAANALYSIS was performed at 10:25:00z. |
| 07-15-2003 | The Flywheel counter incremented to 402 at 12:03:00z. |
| 07-09-2003 | At 23:34:56z a UTCF Adjustment was performed and the UCTF was adjusted by -913.0 ms. |
| 07-07-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for August 04, 2003 (03-216). |
| 07-04-2003 | A 180 degree yaw maneuver (#90) was performed at 11:36:13. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for August 05, 2003 (03-217). |
| 07-02-2003 | The next TRMM Configuration Control Board (CCB) is scheduled for August 07, 2003 (03-219). |
| 06-29-2003 | At 23:08:36z a UTCF Adjustment was performed and the UCTF was adjusted by -910.0 ms. |
| 06-20-2003 | A 180 degree yaw maneuver (#89) was performed at 19:13:41. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for July 04, 2003 (03-185). |
| 06-19-2003 | Two VIRS Solar Calibrations were performed; #1 at 05:14:08z, and #2 at 08:19:08z. |
| 06-18-2003 | At 23:19:45z a UTCF Adjustment was performed and the UCTF was adjusted by -927.0 ms. |
| 06-16-2003 | A PRLNAANALYSIS was performed at 02:20:00z. |
| 06-10-2003 | The Flywheel counter incremented to 400 at 11:45:00z and 401 at 22:30:00z. |
| 06-04-2003 | The Flywheel counter incremented to 399 at 05:00:29z. |
| 06-02-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for July 07, 2003 (03-188). |
| 05-31-2003 | The Flywheel counter incremented to 398 at 06:19:00z. |
| 05-28-2003 | The next TRMM Configuration Control Board (CCB) is scheduled for July 02, 2003 (03-183). |
| 05-25-2003 | A PR External Calibration was performed at 19:13:34z with a Bin 45. |
| 05-24-2003 | A PR External Calibration was performed at 20:09:00z with a Bin 34. |
| 05-23-2003 | A PR External Calibration was performed at 21:04:25z with a Bin 37. |
| 05-19-2003 | A 180 degree yaw maneuver (#88) was performed at 05:24:38. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for June 20, 2003 (03-171). |
| 05-17-2003 | At 23:57:00z a UTCF Adjustment was performed and the UCTF was adjusted by -909.0 ms. |
| 05-10-2003 | The Flywheel counter incremented to 397 at 07:43:00z. |
| 05-05-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for June 02, 2003 (03-153). |
| 05-04-2003 | Two VIRS Solar Calibrations were performed; #1 at 07:38:00z, and #2 at 09:10:30z |
| 05-02-2003 | A 180 degree yaw maneuver (#87) was performed at 15:38:34. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for May 19, 2003 (03-139). |
| 04-26-2003 | At 23:14:00z a UTCF Adjustment was performed and the UCTF was adjusted by -887.0 ms. |
| 04-23-2003 | The next TRMM Configuration Control Board (CCB) is scheduled for May 28, 2003 (03-148). |
| 04-23-2003 | The Flywheel counter incremented to 396 at 01:14:33z. |
| 04-19-2003 | A PRLNAANALYSIS was performed at 08:30:00z. |
| 04-07-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for May 05, 2003 (03-125). |
| 04-05-2003 | The Flywheel counter incremented to 395 at 22:12:14z. |
| 04-04-2003 | A 180 degree yaw maneuver (#86) was performed at 15:20:49. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for May 02, 2003 (03-122). |
| 03-26-2003 | The Flywheel counter incremented to 394 at 10:03:33z. |
| 03-23-2003 | The Flywheel counter incremented to 393 at 02:15:01z. |
| 03-21-2003 | A PRLNAANALYSIS was performed at 22:25:00z. |
| 03-19-2003 | The next TRMM Configuration Control Board (CCB) is scheduled for April 23, 2003 (03-113). |
| 03-14-2003 | At 22:35:03z a UTCF Adjustment was performed and the UCTF was adjusted by -845.0 ms. |
| 03-12-2003 | The Flywheel counter incremented to 392 at 21:10z. |
| 03-12-2003 | A 180 degree yaw maneuver (#85) was performed at 04:33:09. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for April 04, 2003 (03-094). |
| 03-12-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for March 31, 2003 (03-090). |
| 03-12-2003 | The next TRMM Configuration Control Board (CCB) is scheduled for March 19, 2003 (03-078). |
| 03-09-2002 | A PR External Calibration was performed at 10:10:41z with a Bin 59 and another PR External Calibration was performed at 11:48:19z with a Bin 64. |
| 03-08-2002 | A PR External Calibration was performed at 11:06:13z with a Bin 38. |
| 03-05-2003 | At 22:25:15z a UTCF Adjustment was performed and the UCTF was adjusted by -941.0 ms. |
| 03-05-2003 | The Flywheel counter incremented to 391 at 06:42z. |
| 03-04-2003 | A new ACS System Table 51 was loaded to the spacecraft to adjust the DSS Residual Tolerance from 0.2° to 0.1°. |
| 03-03-2003 | The Flywheel counter incremented to 390 at 13:06z. |
| 03-02-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for April 07, 2003 (03-097). |
| 03-02-2003 | The Flywheel counter incremented to 389 at 22:13z. |
| 02-27-2003 | The Flywheel counter incremented to 388 at 10:24z. |
| 02-24-2003 | The Flywheel counter incremented to 387 at 14:52z. |
| 02-21-2003 | A PRLNAANALYSIS was performed at 12:10:00z. |
| 02-19-2003 | At 23:32:56z a UTCF Adjustment was performed and the UCTF was adjusted by -970.0 ms. |
| 02-19-2003 | The Flywheel counter incremented to 386 at 11:14z. |
| 02-19-2003 | A 180 degree yaw maneuver (#84) was performed at 04:22:01. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for March 12, 2003 (03-071). |
| 02-15-2003 | The Flywheel counter incremented to 385 at 19:22z. |
| 02-14-2003 | The Flywheel counter incremented to 384 at 12:32z. |
| 02-11-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for March 03, 2003 (03-062). |
| 02-10-2003 | The Flywheel counter incremented to 383 at 22:43z. |
| 02-08-2003 | At 23:01:10z a UTCF Adjustment was performed and the UCTF was adjusted by -909.0 ms. |
| 02-02-2003 | The next TRMM Monthly Status Review (MSR) is scheduled for February 11, 2003 (03-042). |
| 01-29-2003 | The TRMM Controlled Re-Entry Plan Review was conducted (03-029). |
| 01-24-2003 | At 23:40:00z a UTCF Adjustment was performed and the UCTF was adjusted by -934.0 ms. |
| 01-23-2003 | The Flywheel counter incremented to 380 at 01:16z. |
| 01-20-2003 | A 180 degree yaw maneuver was performed at 04:15:34. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for February 19, 2003 (03-050). |
| 01-20-2003 | The next TRMM Configuration Control Board (CCB) is scheduled for March 12, 2003 (03-071). |
| 01-18-2003 | A PRLNAANALYSIS was performed at 02:45z. |
| 01-08-2003 | At 23:05:21z a UTCF Adjustment was performed at 23:23:22z, and the UCTF was adjusted by -907.0 ms. |
| 01-05-2003 | A 180 degree yaw maneuver was performed at 15:50:12. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for January 20, 2003 (03-020). |
| 01-04-2003 | Two VIRS Solar Calibrations were performed; #1 at 05:50:10z, and #2 at 08:55:10z. |
| 2001 News |
2000 News |
1999 News |
1998 News |
1997 News |
Top of page |
|
| 2002 |
| 12-18-2002 | At 23:05:21z a UTCF Adjustment was performed, and the UCTF was adjusted by -888.0 ms. |
| 12-16-2002 | The next TRMM Configuration Control Board (CCB) is scheduled for January 21st (03-021). |
| 12-15-2002 | A PR External Calibration was performed at 05:58:55z with a Bin 66. |
| 12-14-2002 | A PR External Calibration was performed at 05:16:58z with a Bin 41 and at 06:54:36 with a Bin 44. |
| 12-10-2002 | The next TRMM Configuration Control Board (CCB) is scheduled for December 16th (02-350). |
| 12-10-2002 | Monthly Status Reviews (MSRs) are suspended indefinitely. |
| 12-08-2002 | The Flywheel counter incremented to 378 at 03:57z. |
| 12-06-2002 | Two VIRS Solar Calibrations were performed; #1 at 06:20:24z, and #2 at 09:25:18z |
| 12-03-2002 | A 180 degree yaw maneuver was performed at 22:56:10. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for January 06, 2002 (03-006). |
| 11-29-2002 | The Flywheel counter incremented to 377 at 10:10z . |
| 11-21-2002 | A PR PRLOGAMPCHECK command request was performed at 325/23:00z. |
| 11-19-2002 | The LIS, PR, TMI, and VIRS instruments were powered off for the peak of the
Leonid Storm.The Instrument Shut Down and Activation activities are shown
below:
- LIS was powered-off 11-19-02 at 00:37:18; power-on procedure completed on
11-19-00 at 14:39:34 |
| 11-18-2002 | A 180 degree yaw maneuver was performed at 23:42:35. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for December 04, 2002 (02-338). |
| 11-16-2002 | Two VIRS Solar Calibrations were performed; #1 at 06:52:06z, and #2 at 09:57:14z |
| 11-09-2002 | The Flywheel counter incremented to 374 at 21:32z and 375 at 23:06z. |
| 11-07-2002 | The Flywheel counter incremented to 372 at 09:16z and 373 at 21:38z.. |
| 11-05-2002 | The Flywheel counter incremented to 370 at 02:17z and 371 at 03:53z. |
| 11-02-2002 | The next TRMM Configuration Control Board (CCB) is scheduled for December 10th (02-344). |
| 11-02-2002 | The TC Mode Flywheel Dwell counter incremented to 369 at 21:32z. |
| 11-01-2002 | The November Monthly Status Review (MSR) is scheduled for December 6th (02-340). |
| 10-25-2002 | The TRMM Monthly Status Review (MSR) for October has been scheduled for Friday November 1st (02-305). |
| 10-25-2002 | At 23:56:00z a UTCF Adjustment was performed, and the UCTF was adjusted by -957.6 ms. |
| 10-23-2002 | Two VIRS Solar Calibrations were performed; #1 at 06:06:04z, and #2 at 09:11:32z |
| 10-20-2002 | A 180 degree yaw maneuver was performed at 13:28:52. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for November 18, 2002 (02-322). |
| 10-18-2002 | The TC Mode Flywheel Dwell counter incremented to 368 at 11:18z. |
| 10-14-2002 | At 22:24:44z a UTCF Adjustment was performed, and the UCTF was adjusted by -903.5 ms. |
| 10-13-2002 | The TC Mode Flywheel Dwell counter incremented to 367 at TDE/ 22:25z. |
| 10-08-2002 | The TC Mode Flywheel Dwell counter incremented to 366 at TDW/ 09:56z. |
| 10-07-2002 | The TC Mode Flywheel Dwell counter incremented to 365 at TDE/ 14:42z. |
| 10-04-2002 | The TC Mode Flywheel Dwell counter incremented to 364 at TDS/ 20:51z. |
| 10-02-2002 | At 22:24:52z a UTCF Adjustment was performed, and the UCTF was adjusted by -904.5 ms. |
| 09-29-2002 | The TRMM Monthly Status Review (MSR) for October has not been scheduled. |
| 09-29-2002 | A 180 degree yaw maneuver was performed at 02:30:48. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for October 20, 2002 (02-293). |
| 09-27-2002 | The TC Mode Flywheel Dwell counter incremented to 363 at 171/ 06:16z. |
| 09-24-2002 | The next TRMM Configuration Control Board (CCB) is scheduled for October 29th (02-302). |
| 09-19-2002 | At 23:00:22z a UTCF Adjustment was performed, and the UCTF was adjusted by -833.0 ms. |
| 09-19-2002 | The TC Mode Flywheel Dwell counter incremented to 362 at TDE 20:11z. |
| 09-16-2002 | The TRMM Monthly Status Review (MSR) for September has been cancelled. |
| 09-13-2002 | A PR External Calibration was performed at 08:40:56z with a Bin 61. |
| 09-12-2002 | A PR External Calibration was performed at 04:33:12z with a Bin 50 and at 06:10:50 with a Bin 35. |
| 09-06-2002 | The TRMM Monthly Status Review (MSR) for September has not been scheduled. |
| 09-06-2002 | A 180 degree yaw maneuver was performed at 00:58:27. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for September 29, 2002 (02-272). |
| 09-05-2002 | At 23:47:16z a UTCF Adjustment was performed, and the UCTF was adjusted by -880.0 ms. |
| 09-02-2002 | The TC Mode Flywheel Dwell counter incremented to 361 at 06:30z. |
| 09-02-2002 | The TC Mode Flywheel Dwell counter incremented to 360 at 00:42z. |
| 08-30-2002 | The TC Mode Flywheel Dwell counter incremented to 359 at 17:13z. |
| 08-28-2002 | The TC Mode Flywheel Dwell counter incremented to 358 at 10:52z. |
| 08-26-2002 | The next TRMM Configuration Control Board (CCB) is scheduled for September 24th (02-267). |
| 08-19-2002 | The TRMM Monthly Status Review (MSR) scheduled for August has been cancelled. |
| 08-16-2002 | At 23:47:16z a UTCF Adjustment was performed, and the UCTF was adjusted by -927.0 ms. |
| 08-16-2002 | The TC Mode Flywheel Dwell counter incremented to 357 at 00:39z. |
| 08-08-2002 | A 180 degree yaw maneuver was performed at 13:53:32. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for September 06 (02-249). |
| 08-07-2002 | The TC Mode Flywheel Dwell counter incremented to 356 at 12:15z. |
| 08-02-2002 | The TC Mode Flywheel Dwell counter incremented to 355 at 11:27z. |
| 07-31-2002 | The August TRMM Monthly Status Review (MSR) has not been scheduled yet. (02-212). |
| 07-25-2002 | The next Configuration Control Board (CCB) is scheduled for August 29th (02-241). |
| 07-25-2002 | The TRMM Monthly Status Review (MSR) scheduled for July 31st (02-212) has been cancelled. |
| 07-23-2002 | A 180 degree yaw maneuver was performed at 04:44:54. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for August 08 (02-220). |
| 07-20-2002 | Two VIRS Solar Calibrations were performed; one at 07:56:30z through 07:59:10z, and the other at 09:28:54z through 09:31:34z. |
| 07-20-2002 | A PR External Calibration was performed at 07:46:00z with a Bin 36. |
| 07-20-2002 | A PR External Calibration was performed at 08:40:56z with a Bin 34. |
| 07-02-2002 | The Magnetic Field model has been updated from an Epoch 1995 model to an Epoch 2000 model. |
| 07-02-2002 | At 23:03:27z a UTCF Adjustment was performed, and the UCTF was adjusted by -846.0 ms. |
| 06-26-2002 | The next TRMM Monthly Status Review (MSR) is scheduled for July 31st (02-212). |
| 06-22-2002 | At 23:25:56z a UTCF Adjustment was performed, and the UCTF was adjusted by -913.0 ms. |
| 06-20-2002 | A 180 degree yaw maneuver was performed at 10:18:51. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for July 23rd (02-204). |
| 06-16-2002 | The TC Mode Flywheel Dwell counter incremented to 350 at 20:45z. |
| 06-11-2002 | At 23:41:26z a UTCF Adjustment was performed, and the UCTF was adjusted by -879.0 ms. |
| 06-10-2002 | The next Configuration Control Board (CCB) is scheduled for July 25th (02-206). |
| 06-06-2002 | A 180 degree yaw maneuver was performed at 00:11:54. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for June 20th (02-171). |
| 06-05-2002 | The TC Mode Flywheel Dwell counter incremented to 349 at 02:50z. |
| 06-04-2002 | Two VIRS Solar Calibrations were performed ; one at 18:42:50z through 18:45:30z, and the other at 21:47:46z through 21:50:26. |
| 05-30-2002 | At 23:58:47z a UTCF Adjustment was performed, and the UCTF was adjusted by -882.0 ms. |
| 05-30-2002 | The TC Mode Flywheel Dwell counter incremented to 348 at 05:07z. |
| 05-29-2002 | The next TRMM Monthly Status Review (MSR) is scheduled for June 26th (02-177). |
| 05-25-2002 | The TC Mode Flywheel Dwell counter incremented to 347 at 18:06z. |
| 05-14-2002 | At 23:20:51z a UTCF Adjustment was performed, and the UCTF was adjusted by -885.0 ms. |
| 05-08-2002 | Two routine Solar Calibrations were performed at 17:29:34z and 20:34:40z |
| 05-06-2002 | A 180 degree yaw maneuver was performed at 00:11:54. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for June 6th (02-157). |
| 05-02-2002 | The next Configuration Control Board (CCB) is scheduled for June 10th (02-161). |
| 04-26-2002 | The first event with the new TDRS 171 satellite was taken at 16:56:30z without incident |
| 04-25-2002 | A USCCS clock adjustment was performed, and the clock was adjusted by is -887.0 ms at 22:33:56. |
| 04-24-2002 | A new LOS RTS has been loaded to the spacecraft to offset Transponder 2. Trending will be done to determine the performance of this new RTS. |
| 04-24-2002 | The next Monthly Status Review (MSR) is scheduled for May 29th (02-149). |
| 04-19-2002 | A PR External Calibration was performed at 07:02:30 with a Bin 70 |
| 04-17-2002 | A 180 degree yaw maneuver was performed at 13:42:07. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for May 6th (02-126). |
| 04-16-2002 | Two routine Solar Calibrations were performed at 05:52:34 and 10:30:00. |
| 03-28-2002 | The next Configuration Control Board (CCB) is scheduled for May 2nd (02-122). |
| 03-27-2002 | The next Monthly Status Review (MSR) is scheduled for April 24th (02-114). |
| 03-22-2002 | A 180 degree yaw maneuver was performed at 11:41:14. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for April 17th (02-107). |
| 03-21-2002 | Two routine VIRS Solar Calibrations were performed at 07:50:28 and 10:55:28 |
| 03-12-2002 | A USCCS clock adjustment was performed, and the clock was adjusted by -846.0 ms at 22:47:11z. A Frequency Standard Adjustment was also performed, and the FS was adjusted by 12 counts at 22:48:37. |
| 03-02-2002 | At 23:05:17z, a UTCF Adjustment was performed and the UTCF was adjusted by -901.0 ms. The new UTCF value is 31535996.809196 seconds. The current drift value is -85.0 ms. The Frequency Standard remains at x’7DE’ with a drift rate of -3.57 ms/hr. |
| 02-27-2002 | The next Monthly Status Review (MSR) is scheduled for March 27th (02-086). |
| 02-24-2002 | A 180 degree yaw maneuver was performed at 23:31:52. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for March 22nd (02-081). |
| 02-19-2002 | At 23:02:08z a UTCF Adjustment was performed, and the UCTF was adjusted by -837.0 ms. |
| 02-13-2002 | The next Configuration Control Board (CCB) is scheduled for March 28th (02-087). |
| 02-07-2002 | Two sets of VIRS Solar Calibrations were performed |
| 02-07-2002 | At 23:41:51 a UTCF Adjustment was performed, and the UCTF was adjusted by -871.0 ms. |
| 02-06-2002 | A 180 degree yaw maneuver was performed at 02:14:15. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for February 24th (02-055). |
| 02-03-2002 | The next Configuration Control Board (CCB) is scheduled for February 13th (02-044). |
| 01-29-2002 | The next Monthly Status Review (MSR) is scheduled for February 27th (02-058). |
| 01-25-2002 | The PSIB B-side AUTOSPRU was enabled on Friday, January 18th and disabled on Friday, January 25th to prevent overcharging during high beta angles. |
| 01-23-2002 | The UTCF was adjusted by -829.5 ms on 02-023. The current UTCF value is 31535996.811805 seconds. The current drift value is -203.0 ms. The Frequency Standard remains x’7DE’ with a current drift rate of -2.219 ms/hr. |
| 01-11-2002 | The next Monthly Status Review (MSR) is scheduled for January 29th (02-011). |
| 01-08-2002 | Two routine Solar Calibrations were performed at 07:17:04 and 10:22:00 |
| 01-05-2002 | A 180 degree yaw maneuver was performed at 19:15:40. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for February 6th (02-037). |
| 01-03-2001 | The next Configuration Control Board (CCB) is scheduled for February 3rd (02-034). |
| 01-02-2002 | The UTCF was adjusted by -873.661ms on 02-002 . The current UTCF value is 31535996.812634 seconds. The current drift value is -90.0 ms. |
| 2000 News |
1999 News |
1998 News |
1997 News |
Top of page |
|
| 2001 |
| 12-23-2001 | A 180 degree yaw maneuver was performed at 02:52:01. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for January 5th (02-005). |
| 11-29-2001 | The next Configuration Control Board (CCB) is scheduled for January 3rd (02-003). |
| 11-28-2001 | The next Monthly Status Review (MSR) is scheduled for January 9th (02-009). |
| 11-27-2001 | TRMM celebrated 4 successful years in-orbit on Tuesday November 27th (01-331). |
| 11-18-2001 | The LIS, PR, TMI, and VIRS instruments were powered off for the peak of the
Leonid Storm.The Instrument Shut Down and Activation activities are shown
below:
- LIS was powered-off 11-18-01 at 07:48:24; power-on procedure completed on
11-18-00 at 22:07:16 |
| 11-20-2001 | A 180 degree yaw maneuver was performed at 14:40:58. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for December 23rd (01-357). |
| 11-18-2001 | The UTCF was adjusted by -907 ms on 01-322. The new UTCF value is now 31535996.813508 seconds. The current drift value is -2.6 ms. The Frequency Standard was adjusted by 12 counts to x’7DE’ on 01-322. The current drift rate is -0.1 ms/hr. |
| 11-08-2001 | The next Monthly Status Review (MSR) is scheduled for November 28th (01-333). |
| 11-08-2001 | The UTCF was adjusted by -937 ms on 01-312 at 23:43z. The current UTCF value is now 31535996.814415 seconds. The current drift value is -267.0 ms. The Frequency Standard remains at x’7D2’ with a current drift rate of -3.8 ms/hr. |
| 11-07-2001 | Two routine Solar Calibrations were performed at 06:26:58z and 09:32:00z. |
| 11-04-2001 | A 180 degree yaw maneuver was performed at 06:58:54. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for November 20th (01-324). |
| 10-31-2001 | The next Monthly Status Review (MSR) is scheduled for November 8th (01-312). |
| 10-27-2001 | The next Configuration Control Board (CCB) is scheduled for November 29th (01-331). |
| 10-22-2001 | The UTCF was adjusted by -920.0 ms on October 28th (01-301). The current value is 31535996.815352 seconds. The current drift value is -3.0 ms. The Frequency Standard remains at x’7D2’ with a current drift rate of -3.18 ms/hr. |
| 10-22-2001 | The next Configuration Control Board (CCB) is scheduled for October 27th (01-331). |
| 10-15-2001 | The UTCF was adjusted by -914.5 ms on October 15th (01-288). The new value is 31535996.816272 seconds. The current drift value is -409.0 ms. The Frequency Standard remains at x’7D2’ with a current drift rate of -2.99 ms/hr. |
| 10-07-2001 | A 180 degree yaw maneuver was performed at 09:45:23. TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for November 4th (01-308). . |
| 10-02-2001 | The next Monthly Status Review (MSR) is scheduled for October 31st (01-304). |
| 10-01-2001 | The UTCF was adjusted by -948 ms. The new value is 3135996.817187 seconds. The current drift value is -380.0 ms. The Frequency Standard remains at x’7D2’ with a current drift rate of -2.7 ms/hr. |
| 09-13-2001 | A 180 degree yaw maneuver was performed at 19:52:18. TRMM is flying in the +X Forward direction. The next Yaw maneuver is scheduled for October 7th (01-280). |
| 08-30-2001 | The next Configuration Control Board (CCB) meeting is scheduled for October 2nd (01-275). |
| 08-29-2001 | The next Monthly Status Review (MSR) is scheduled for September 26th (01-269). |
| 08-24-2001 | The sixth Burn Pair (Fine Adjust)of the TRMM Satellite Boost was performed on August 24th (01-236) at 13:41:48 and 14:12:30. The Final altitude is 402.5 km. See the News on TRMM Boost for additional details. |
| 08-23-2001 | A 180 degree yaw maneuver was performed at 19:42:03 TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for September 13th (01-256). |
| 08-22-2001 | The fifth Burn Pair of the TRMM Satellite Boost was performed on August 22nd (01-234) at 18:03:00 and 18.49:00. The Mean Altitude is 402 km. |
| 08-21-2001 | The fourth Burn Pair of the TRMM Satellite Boost was performed on August 21st (01-233) at 14:24:00 and 15:10:00. The Mean Altitude is 393 km. |
| 08-16-2001 | The UTCF was adjusted by 897.0 ms, and the current UTCF value is 3135996.818135 seconds. The current drift value is +782.0 ms. The Frequency Standard remains at x’7D2’ with a current drift rate of -0.67 ms/hr. |
| 08-13-2001 | The LIS, PR, TMI, and VIRS instruments were powered off as part of the Loadshed procedures when the spacecraft transitioned to Sun Acquisition mode.
- LIS was powered-off on 08-13-2001; power-on procedure completed on
08-17-01 at 21:34:47z. |
| 08-09-2001 | The third Burn Pair of the TRMM Satellite Boost was performed on August 9th (01-221) at 15:47:00 and 16:33:00. The Mean Altitude is 383 km. |
| 08-08-2001 | The second Burn Pair of the TRMM Satellite Boost was performed on August 8th (01-220) at 16:50:00 and 17:36:00. The Mean Altitude is 372 km. |
| 08-07-2001 | The first Burn Pair of the TRMM Satellite Boost was performed on August 7th (01-219) at 14:54:00 and 15:40:00. The Mean Altitude is 360 km. |
| 08-03-2001 | The UTCF was adjusted by -829.0 ms on August 3 rd (01-215) at 22:53:32z. The new value is 31535996.819310 seconds and the current drift value is -185.5 ms. The Frequency Standard remains at x’7C6’ with a current drift rate of -3.82 ms/hr. |
| 07-25-2001 | The next Monthly Status Review (MSR) is scheduled for August 29th (01-241). |
| 07-25-2001 | The UTCF was adjusted by -903.3 ms (01-206) at 23:28:05z. The new value is 31535996.820139 seconds and the current drift value is -373.0 ms. The Frequency Standard remains at x’7C6’ with a current drift rate of -3.84 ms/hr. |
| 07-25-2001 | The 402.5 km Boost Command Authorization Meeting was held on July 25th (01-206). |
| 07-25-2001 | A 180 degree yaw maneuver was performed at 04:14:33 TRMM is flying in the +X Forward direction.The next Yaw maneuver is scheduled for August 23rd (01-235). |
| 07-10-2001 | The next Configuration Control Board (CCB) meeting is scheduled for August 30th (01-242). |
| 07-10-2001 | A 180 degree yaw maneuver was performed at 13:45:38 TRMM is flying in the -X Forward direction. The next Yaw maneuver is scheduled for July 25th (01-206). |
| 07-05-2001 | A successful 55° Solar Array Off-pointing test was conducted on July 5th, 2001 (01-186) to characterize the power system in this configuration near a 26° beta angle. |
| 07-04-2001 | The UTCF was adjusted by -951.545 ms (01-185). The new value is 31535996.821955 seconds and the current drift value is -351.0 ms. The Frequency Standard remains at x’7C6’ with a current drift rate of 3.5594 ms/hr. |
| 06-29-2001 | The 400 km Boost Technical ORR was conducted and the panel recommended that boost operations can begin as planned as long as all programmatic issues are resolved |
| 06-25-2001 | The next Monthly Status Review (MSR) is scheduled for July 25th (01-206). |
| 06-08-2001 | A 180 degree yaw maneuver was performed at 07:30:30 ;The TRMM spacecraft is now flying in the +X Forward direction. The next Yaw maneuver is scheduled for July 10th (01-191). |
| 06-07-2001 | The next Configuration Control Board (CCB) meeting is scheduled for July 12, 2001 (01-163). |
| 05-30-2001 | PACOR-A parallel operations continue. The PACOR-A ORR is still scheduled for June 13, 2001 (01-164). |
| 05-30-2001 | The first 400 km Boost planning meeting is scheduled for June 20, 2001 (01-171). |
| 05-30-2001 | The next Monthly Status Review (MSR) is scheduled for June 28, 2001 (01-179). |
| 05-29-2001 | A final elevation gimbal test was performed, then CERES was powered off on May 29, 2001 (01-149) |
| 05-25-2001 | A 180 degree yaw maneuver was performed at 06:43:59 ;The TRMM spacecraft is now flying in the -X Forward direction. The next Yaw maneuver is scheduled for June 08th (01-159). |
| 05-24-2001 | Final gimbal testing to the Ceres instrument prior to permanent shutdown will occur next week, so the instrument can be powered off prior to solar array off-pointing tests. Currently, the command sequence for the gimbal test is being reviewed and finalized. |
| 05-23-2001 | The Next End of Life Meeting is scheduled for May 30, 2001 (01-150). |
| 05-19-2001 | TRMM surpassed the 20,000 orbit mark on May 19, 2001 (01-139). |
| 05-16-2001 | The Next End of Life Meeting is scheduled for May 23, 2001 (01-143). |
| 05-07-2001 | The next Configuration Control Board (CCB) meeting is scheduled for June 7, 2001 (01-158). |
| 05-09-2001 | The Next End of Life Meeting is scheduled for May 16, 2001 (01-136). |
| 05-02-2001 | The next Monthly Status Review (MSR) is scheduled for May 30, 2001 (01-150). |
| 05-02-2001 | The Next End of Life Meeting is scheduled for May 9, 2001 (01-129). |
| 04-25-2001 | A 180 degree yaw maneuver was performed at 08:52:22;The TRMM spacecraft is now flying in the +X Forward direction. The next Yaw maneuver is scheduled for May 25th (01-145). |
| 04-23-2001 | The next Monthly Status Review (MSR) is scheduled for May 2, 2001 (01-122). |
| 04-23-2001 | The Next End of Life Meeting is scheduled for May 2, 2001 (01-122). |
| 04-19-2001 | The TRMM Preliminary End of Life Review was held on April 19 2001 (01-109). |
| 04-11-2001 | LIS Real-time commands to reset thresholds were sent on April 11, 2001 (01-101). |
| 04-05-2001 | A 180 degree yaw maneuver was performed at 19:28:36;The TRMM spacecraft is now flying in the -X forward direction. The next yaw maneuver is scheduled for April 25th (01-115). |
| 04-01-2001 | The next Configuration Control Board (CCB) meeting is scheduled for April 26th (01-116). |
| 04-01-2001 | The next Monthly Status Review (MSR) is scheduled for April 25th (01-115). |
| 03-18-2001 | The End of Life Preliminary Review has been re-scheduled for April 19th (01-109). |
| 03-18-2001 | The UTCF was adjusted by -882 ms on 01/077 at 23:13z and is now 31535996.828272 seconds. The current drift value is -2 ms. The Frequency Standard remains at x’7BA’ with a current drift rate of -2.59 ms/hr. |
| 03-13-2001 | Testing is now complete with the TRMM TPOCC System Software Release 9.0 on String 2, with no problems encountered. The FOT will continue testing for one more week as the realtime backup Once it has been verified by the FOT, Release 9.0 will then be installed on the remaining two strings, and made operational one string at a time |
| 03-12-2001 | A 180 degree yaw maneuver was performed at 19:23:40;The TRMM spacecraft is now flying in the +X forward direction. The next yaw maneuver is scheduled for April 5th (01-095). |
| 03-12-2001 | The next Configuration Control Board (CCB) meeting is scheduled for March 29th (01-088). |
| 03-06-2001 | The TC Mode Flywheel Dwell counter incremented to 315 at 04:58. |
| 02-27-2001 | Ground System :The TRMM TPOCC System Software Release 9.0 has been installed on String-2. and continues to be evaluated. The FOT is currently using this String in operations as the backup string. |
| 02-26-2000 | CERES: No change in status. |
| 02-16-2001 | The next End of Life Planning meeting is scheduled for March 28th (01-087). |
| 02-16-2001 | The next Monthly Status Review (MSR) is scheduled for March 28th (01-087). |
| 02-14-2001 | A 180 degree yaw maneuver was performed at 12:23:46;The TRMM spacecraft is now flying in the -X forward direction. The next yaw maneuver is scheduled for March 12th (01-071) |
| 02-05-2001 | The next Monthly Status Review (MSR) meeting is scheduled for March 7th (01-060). |
| 01-28-2001 | A 180 degree yaw maneuver was performed at 10:29:28;The TRMM spacecraft is now flying in the +X forward direction. The next yaw maneuver is scheduled for February 14th (01-045) |
| 01-25-2001 | The next Flight Software CCB meeting is scheduled for March 1st (01-060). |
| 01-25-2001 | The next End of Life Planning meeting is scheduled for February 28th (01-059). |
| 01-02-2001 | The next Monthly Status Review (MSR) is scheduled for January 31st (01-031). |
| 01-01-2001 | The Extended Mission Science Operations began on January 1st (01-001). |
| 1999 News |
1998 News |
1997 News |
Top of page |
|
| 2000 |
| 12-28-2000 | A 180 degree yaw maneuver was performed at 04:36:47;The TRMM spacecraft is now flying in the -X forward direction. The next yaw maneuver is scheduled for January 28th (01-028) | |
| 12-14-2000 | The next Flight Software CCB meeting is scheduled for January 23th (01-023). | |
| 12-15-2000 | A 180 degree yaw maneuver was performed at 01:09:03;The TRMM spacecraft is now flying in the +X forward direction. The next yaw maneuver is scheduled for December 28th (00-363) | |
| 12-14-2000 | CERES was powered ON. It remains in the same condition as it was following the PSIB anomaly. A decision has yet to be made as to whether or not to permanently power off the instrument (00-349). | |
| 12-14-2000 | The next End of Life Planning meeting is scheduled for January 24th (01-027). | |
| 12-14-2000 | The next Monthly Status Review (MSR) is scheduled for January 3rd (01-003). | |
| 11-17-2000 | The LIS, PR, TMI, and VIRS instruments were powered off for the peak of the
Leonid Storm.The Instrument Shut Down and Activation activities are shown
below:
- LIS was powered-off 11-17-00 at 23:59:27; power-on procedure completed on
11-18-00 at 1:05:18 | |
| 11-13-2000 | A 180 degree yaw maneuver was performed at 19:17:00;The TRMM spacecraft is now flying in the -X forward direction. The next yaw maneuver is scheduled for December 15th (00-350). | |
| 11-08-2000 | CERES remains powered OFF, following the original PSIB anomaly on September 16th (00-261). | |
| 11-08-2000 | The next Monthly Status Review (MSR) is scheduled for December 6th (00-341). | |
| 11-03-2000 | The PR instrument performed nominally during this period. PR external calibrations were performed on 00-308 November 3, 2000 at 15:45:16z and 00-309 (November 4th, 2000) at 14:33:02z and 16:09:29. | |
| 11-02-2000 | CERES remains powered OFF, following the original PSIB anomaly on September 16th (00-261). | |
| 10-27-2000 | The next End of Life Planning meeting is scheduled for November 29th (00-334). | |
| 10-27-2000 | A 180 degree yaw maneuver was performed at 18:52:39;The TRMM spacecraft is now flying in the +X forward direction. The next yaw maneuver is scheduled for November 13th. | |
| 10-24-2000 | The LIS instrument performed nominally during this period. A standard LIS reset command request was performed on October 24th (00-298) to reduce the usual accumulation of packet sequence errors. | |
| 10-04-2000 | The next Monthly Status Review (MSR) is scheduled for November 1 (00-306). | |
| 10-04-2000 | The next End of Life Planning meeting is scheduled for October 25th (00-299). | |
| 10-01-2000 | A 180 degree yaw maneuver was performed at 08:51:45;The TRMM spacecraft is now flying in the -X forward direction. The next yaw maneuver is scheduled for October 30, 2000. | |
| 09-14-2000 | The next TRMM End-Of-Life and Controlled Reentry Planning Meeting is scheduled for September 27th 2000. | |
| 09-14-2000 | The next Monthly Status Review (MSR) is scheduled for October 4th 2000. | |
| 09-10-2000 | The CERES Instrument remains in Diagnostic Mode; assesment continues for the instrument state of health. | |
| 09-07-2000 | A 180 degree yaw maneuver was performed at 13:38:12;The TRMM spacecraft is now flying in the +X forward direction. The next yaw maneuver is scheduled for October 1st 2000. | |
| 08-23-2000 | The next Configuration Control Board (CCB) meeting is scheduled for August 28th (00-241). | |
| 08-18-2000 | Mission Day 1000 will occur on August 23 (00-236). | |
| 08-18-2000 | A 180 degree yaw maneuver was performed at 19:24:26z; The TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for September 7,2000.) | |
| 08-02-2000 | The next Monthly Status Review is scheduled for September 6th (00-250). | |
| 08-02-2000 | The next EOL Planning meeting is scheduled for August 30th (00-243) | |
| 07-27-2000 | The first TRMM End-Of-Life and Controlled Reentry Planning Meeting was held. 151 days remain until the Extended Mission science operations begin (1/1/2000). | |
| 07-23-2000 | The CERES Instrument remains in Diagnostic Mode. | |
| 07-19-2000 | A 180 degree yaw maneuver was performed at 18:30:41; The TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for August 18, 2000.) | |
| 07-09-2000 | 176 days remain until the Extended Mission science operations begin (1/1/2001). | |
| 07-05-2000 | A 180 degree yaw maneuver was performed at 14:41:36; The TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for July 19, 2000.) | |
| 06-11-2000 | The significant milestone of 200 orbital adjustment maneuvers since
launch was achieved this week. The VIRS Instrument lost 24 minutes of science data due to an event that was inadvertently scheduled out of view. | |
| 06-01-2000 | The CERES Instrument remains in Safe Mode. | |
| 06-03-2000 | A 180 degree yaw maneuver was performed at 08:26:19; The TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for July 5, 2000.) | |
| 05-21-2000 | This week marked the major milestone of 900 days since TRMM's launch into orbit. | |
| 05-19-2000 | A 180 degree yaw maneuver was performed at 22:31:41; The TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for June 3, 2000.) | |
| 05-14-2000 | The LIS Instrument overflowed at 17:14:27z for 1 minute and 3 seconds, which was due to DS1 not being released. | |
| 05-11-2000 | The LIS Instrument performed a standard command request to reset the instrument and reconfigure to nominal was performed at 12:32z. | |
| 05-09-2000 | The CERES Instrument testing continued this week with a new microprocessor load which was uplinked at 17:45z. | |
| 05-07-2000 | No testing was performed on the CERES Instrument. An Internal calibration is scheduled for 05/10/2000. | |
| 05-04-2000 | TRMM Satellite Used to Improve Tropical Forecasting - The TRMM Microwave Imager (TMI) represents the first microwave spacecraft sensor capable of accurately measuring sea-surface temperatures through clouds. Science team members have found that data from the TMI sensor onboard the spacecraft has great potential to increase the accuracy of tropical storm and climate forecasts. Microwave radiation penetrates clouds with little loss of signal thereby providing an uninterrupted view of the ocean surface whereas much of the infrared radiation, typically used for measuring sea-surface temperatures from satellites, are blocked by cloud cover. See the Press Release for additional details. | |
| 04-24-2000 | Testing continued on the CERES Instrument to analyze the effect of the noise/bias on data. | |
| 04-22-2000 | There was a recorder overflow on the TRMM Spacecraft. The VR 2, 3, 4, 5 and 6 TRMM recorders overflowed April 22, 2000 (113) and were not collecting science data as follows: CERES (VR2) 2000:113:01:04:35 - 01:32:41 LIS (VR3) 2000:113:01:06:15 - 01:32:41 PR (VR4) 2000:113:01:06:15 - 01:32:37 TMI (VR5) 2000:113:01:06:18 - 01:32:41 VIRS (VR6) 2000:113:01:06:20 - 01:32:41 | |
| 04-20-2000 | A 180 degree yaw maneuver was performed at 12:52:13; The TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for May 19, 2000.) | |
| 04-10-2000 | The CERES Instrument Total Channel Sensor Temperature Control was disabled at 17:09:01, which reduced the number of bridge balance resets to a normal amount. There have been periodic spikes in analog telemetry, which have lasted for only one packet update, and are believed to be caused by the noise that the instrument is experiencing. | |
| 04-09-2000 | The LaRC team has recently documented noise in the instrument science
data (began 3/17 but the LaRC team did not notice the noise until March
23rd, when it was large enough to be flagged in the ground processing of
the science data). The noise has been gradually increasing since then and
has started to cause bridge balance resets (total, longwave, and
shortwave). These resets appear to occur most frequently at orbit sunset
(sunlight going to eclipse), and there also appears to be a diurnal pattern
to the frequency of the resets. Because the science data is replaced with fill data during these resets and is therefore invalid, the LaRC team has begun to research ways to reduce the frequency, and therefore the impact, of these resets. As a first step to help reduce the frequency of the bridge balance resets, the LaRC team has asked TRW to build a special microprocessor load to redefine the Normal scan range. The new special microprocessor load was tested with the simulator on 4/7/00 and uplinked to the spacecraft later that day, at 20:37z. The LaRC team has reported that the load has reduced the frequency of the resets, but further analysis is required to determine to what extent the new load has helped. | |
| 03-31-2000 | A 180 degree yaw maneuver was performed at 05:12:21; The TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for April 20, 2000.) | |
| 03-07-2000 | A 180 degree yaw maneuver was performed at 23:25:17; The TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for March 31, 2000.) | |
| 03-04-2000 | A VIRS Self-Reset #11 occurred at 12:36:36z. The instrument was manually placed back in the nominal configuration during the next real-time event. | |
| 03-02-2000 | The CERES packets were commanded to gimbal type and AB asynchronous
rotation operations were performed on 02-28-00 (170 - 190 degrees) and
02-29-00 (160 - 200 degree) in an attempt to lubricate the bearings and
characterize their performance. On 03-01-00 the AB async operations
continued using 150 - 210 degree. The instrument stalled twice at 179.7
and 179.8 degree before being commanded to Standby. Nominal CT operations
were then continued at the 179.8 degree position, which is essentially the
nominal CT azimuth position. The AB async testing was resumed on 03-02-00 (170 - 185 degree), with stalls occurring again at 19:48z and 19:51z. The range was then changed to 175 - 185 degree and the instrument successfully moved to 175 degree on command. The AB async testing was resumed (160 - 200 degree) with no further stalls and the instrument mode was commanded back to CT at 22:26:35z. | |
| 02-27-2000 | The CERES instrument Contamination Safe Mode azimuth angle was permanently redefined from 165 degree to 180 degree to match the CT azimuth position and avoid the need to rotate in azimuth for each maneuver. | |
| 02-26-2000 | The CERES azimuth gimbal stalled following the execution of the stored command to send it from Contamination Safe to Crosstrack mode (AR #79) after burn #1 of Delta-V #165. CERES was placed in Safe mode during the event following burn #2 (18:29z). LaRC personnel concluded the azimuth stalled due to the length of time CERES was off and not moving and is not expected to be a permanent problem. CERES was placed back in Crosstrack on 02-27-00 at 20:21:56z | |
| 02-24-2000 | The CERES instrument was turned on to coincide with the eruption of a volcano in the Philippines at 21:26:00z. CERES will now remain on permanently unless there is a low power condition. The instrument will be placed in Safe mode during an ACS anomaly (Sun Acquisition and Safehold). | |
| 02-09-2000 | A 180 degree yaw maneuver was performed at 23:40:51; The TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for March 7, 2000.) | |
| 01-24-2000 | A 180 degree yaw maneuver was performed at 14:30:51; The TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for February 10, 2000.) | |
| 01-23-2000 | The CERES instrument is now targeted to be powered-on mid-February, to begin concurrent with TERRA operations. The CERES modifications to the load-shed scenarios and the new CERES current monitors were uplinked January 20. | |
| 01-18-2000 | A command request from MSFC was performed to reset the LIS instrument, reconfigure it to nominal, and then disable the heater auto-select. | |
| 01-12-2000 | TRMM Satellite Used to Improve Rainfall Forecasting Accuracy - New research shows that the accuracy of three-day rainfall forecasts in the tropics can be improved by as much as 100% percent by combining existing forecast models with satellite rainfall data. Researchers at Florida State University have found that by adding rainfall observations collected by NASA's TRMM satellite and other meteorological satellites to forecast models, they can more than triple the accuracy of rainfall forecasts for the first 12 hours of the forecast. See the Press Release for additional details. | |
| 01-09-2000 | The CERES instrument is now targeted to be powered-on January 27th, concurrent with TERRA operations. (The CCR which involves creating and testing TSMs to monitor the CERES current is expected to be closed out by the end of next week.) |
| 2000 News |
1998 News |
1997 News |
Top of page |
|
| 1999 |
| 12-29-99 |
A special Delta-V maneuver wasperformed to place TRMM above the nominal
orbit box for the year rollover (to allow more time to establish
communication with the spacecraft if difficulties arose with the ground
system). As a result of this extended burn, the next Delta-V is not needed
until 01-10-00. A command request from MSFC was performed at 20:46z to reset the LIS instrument, configure it back to nominal, and disable the heater auto-select. |
| 12-24-99 | A 180 degree yaw maneuver was performed at 19:58:16; The TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for Janaury 24, 2000.) |
| 12-19-99 | A special Delta-V maneuver on December 29th (99-363) will place TRMM
above the nominal orbit box for the year rollover. This will help prevent
TRMM from falling below the box in the event communication with the
spacecraft or the ground system is lost for an extended period due to
Y2K. A special RTS is being built for the year rollover that will place the Observatory in Sun Acquisition mode if communication is lost for more than 24 hours (testing still needs to be completed). |
| 12-16-99 | It has been confirmed that the TRMM satellite will be left on and running during the century change. TSDIS should be receiving both IP and Realtime data during the period (if the networks remain up). |
| 12-15-99 | A walk-through was performed on the CERES instrument for the removal of CERES from load-shed plan. The CERES instrument will be powered on in mid-February 2000; currently there are no plans to manually remove power from the instrument once operations have resumed. |
| 12-10-99 | A 180 degree yaw maneuver was performed at 19:58:16; The TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for December 24.) |
| 12-09-99 | VIRS performed solar calibration operations at 05:47:48z and 08:50:38z. |
| 12-08-99 | VIRS outgassing was performed 12-07 14:33 through 12-08 at 16:59z. |
| 12-01-99 | TRMM Kwajalein Field Experiment information available: |
| 11-27-99 | The TRMM spacecraft has successfully completed its second year of continuous data-gathering. TRMM has produced continuous data since 12-08-97. |
| 11-26-99 | Three PR external Calibrations were performed: 11-24 at 11:30 using beam #25; 11-25 at 02:59:01 using Beam #70; and 11-26 at 01:46:32 using beam #67. |
| 11-17-99 |
The LIS, PR, TMI, and VIRS instruments were powered off for the peak of the
Leonid Storm.The Instrument Shut Down and Activation activities are shown
below: - LIS was powered-off 11-17-99 at 21:25:10; power-on procedure completed on 11-18-99 at 06:53:18 - PR was powered-off 11-17-99 at 19:58:39; power-on and procedure completed on 11-18-99 at 08:34:36 - TMI was powered-off 11-17-99 at 19:57:10; power-on procedure completed on 11-18-99 at 06:43:59 - VIRS was powered-off 11-17-99 at 21:27:56; power-on procedure completed on 11-18-99 at 06:50:58 |
| 11-16-99 | Exciting images of Hurricane Lenny are available at the "Latest Images" page. |
| 11-09-99 | A 180 degree yaw maneuver was performed at 21:42:52; The TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for December 10.) |
| 11-01-99 | The CERES instrument personnel are developing a plan for operating the system; expected to be closed out by the end of the year. A walk-through is planned in December for the removel of CERES from load-shed plan and the results. |
| 10-31-99 | TRMM Leonid strategy for the upcoming storm is the same as the one used for the 1998 Leonid storm. The instruments will be powered off approximately six hours prior to the peak (peak is currently estimated at 99-322 at 02:53:00z) and will be powered on at the Mission Director's discretion after the peak occurs. |
| 10-29-99 | Images of Biomass Buring are available at the "Latest Images"page. |
| 10-23-99 | A 180 degree yaw maneuver was performed at 06:04:12; The TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for November 9.) |
| 10-21-99 | VIRS performed solar calibration operations at 05:12:54z and 08:16:48z. |
| 10-14-99 | An image of Hurricane Irene is available at the "Latest Images"page. |
| 10-05-99 | Press release: Smoke inhibits Rainfall:
For the first time, smoke from forest fires has been proven to inhibit rainfall, according to an extensive analysis of data taken from the TRMM spacecraft. |
| 10-04-99 | The recorders overflowed and were not collecting science data due to
the TRMM MOC experiencing severe degradation of the Q-channel science data
during the 277/02:44 event which resulted in significant downlinked data
gaps. The cause of the degradation is being investigated. LIS 03:50:01z - 04:53:53z PR 03:52:15z - 04:53:48z TMI 03:52:16z - 04:53:53z VIRS 03:52:21z - 04:53:53z |
| 09-27-99 | A 180 degree yaw maneuver was performed at 11:18:39; The TRMM
spacecraft is now flying in the -X forward direction. (The next yaw
maneuver is scheduled for October 23.) Two PR external Calibrations were performed at 18:00:42z using beam #44 and 09-28 at 08:28:28 using beam #73. |
| 09-19-99 | The CERES instrument personnel are developing a plan for operating the system; expected to be closed out by end of October. |
| 09-13-99 | An image of Hurricane Floyd is available at the "Latest Images"page. |
| 09-02-99 | A 180 degree yaw maneuver was performed at 21:30:58; the TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for September 27.) |
| 08-29-99 | The next CERES instrument power-on events for calibrations are now expected near the end of September. |
| 08-24-99 | Orbit #10,000 occurred.
Due to Ground System problems, the recorders overflowed and were not collecting science data for the following: LIS 01:45:06z - 02:35:39z PR 01:47:14z - 03:26:08z TMI 01:47:19z - 03:26:08z VIRS 01:47:20z - 03:57:31z |
| 08-11-99 | The International Earth Rotation Service (IERS) has announced that
there will not be a time step occurring at the end of December 1999. The difference between UTC and International Atomic Time (TAI) will remain: TAI-UTC= +32s until further notice. |
| 08-08-99 | A series of CERES instrument power-on events and calibrations is expected near the end of August. |
| 07-27-99 | PR performed External calibration operations on 07-26 at 18:00:42z using beam #36 and 07-27 at 16:48:00z using beam #35. |
| 07-25-99 | TheCERES instrument work continues in creating and testing the new Tables. RTS testing has been completed. |
| 07-17-99 | Two VIRS Solar Calibration requests were performed at 07:03:06z and 10:05:58z. |
| 07-16-99 | The final Test Review of the TRMM Solar Array FDC Limit change was conducted by Flight Software Maintenance. |
| 07-15-99 | A 180 degree yaw maneuver was performed at 10:18:07; the TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for August 15.) |
| 07-12-99 | Preparations are in full swing for TRMM (KWAJEX, the major over-ocean field campaign) to be conducted in the vicinity of Kwajalein Atoll in the Marshall Islands during the months of July, August, and September 1999. KWAJEX will provide the detailed observations of the physical parameters associated with tropical rainfall that are needed to validate TRMM satellite algorithms including the microphysical parameters required for cloud and precipitation models. |
| 07-05-99 | The CERES instrument was powered for continued Australia testing, and then paused. The testing will resume 07-13-99. |
| 07-04-99 | The CERES instrument was powered for Australia testing seven times this
period. CERES SWICS testing was performed every ten minutes 06-30-99 19:50 through 07-01-99 02:00. Ten minutes of gimbal data was collected in A-B Synchronous mode on 07-01-99 21:20. |
| 07-01-99 | A 180 degree yaw maneuver was performed; the TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for July 15.) |
| 06-28-99 | The CERES instrument was powered for Australia testing six times during this period. The Australia field campaign (instrument Power ON, Crosstrack, and Power OFF) will continue through mid-July. |
| 06-22-99 | A command request from MSFC was performed to reset the LIS instrument and configure it back to nominal. |
| 05-30-99 | A 180 degree yaw maneuver was performed; the TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for July 1.) |
| 05-18-99 | The CERES instrument was powered ON at 18:39:17 for a ground test with
Hawaii and a Solar Calibration was also performed at 22:59:54. A CERES Internal Calibration was performed at 00:55:00 and the instrument was Power OFF at 02:50:42. The next power on for CERES is scheduled for June to coincide with an Australia ground test. |
| 05-15-99 | A 180 degree yaw maneuver was performed; the TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for May 30.) |
| 05-12-99 | The PR instrument performed an External calibration request at 09:34:39. |
| 05-11-99 | A command request from MSFC was performed to reset the LIS instrument and configure it back to nominal. |
| 04-18-99 | The FOT proposal which describes the new method for leaving CERES
powered on for SunAcq/Safehold events has been approved. Simulator testing
and validation will begin in upcoming weeks, including the use of new
tables and RTSs. The next instrument power on and science collection period is planned for May. |
| 04-16-99 | A 180 degree yaw maneuver was performed; the TRMM spacecraft is now
flying in the +X forward direction. (The next yaw maneuver is scheduled for
May 15.) A command request from MSFC to reset the LIS instrument and configure it back to nominal was performed at 14:01. |
| 04-14-99 | The VIRS instrument performed Solar Calibrations at 06:50:00 and
09:52:56 for 120 seconds each. The VIRS instrument performed a self-reset between 22:45:35 and 22:45:56; the instrument was reconfigured back to nominal mode 4/15/99. |
| 03-26-99 | A 180 degree yaw maneuver was performed; the TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for 04-16-99.) |
| 03-25-99 | During this time period (3/22/99 - 3/25/99) the CERES instrument was
powered on for science collection. . Instrument activities included Power
ON, Power OFF, and 180 degree scans. The next test period is planned for May. |
| 03-09-99 | During this time period (3/3/99 - 3/9/99) the CERES instrument was
powered on for science collection. The +15 V DAA converter voltage has
remained below the 20 V saturation threshold throughout the test. The next test period is planned for March 16th. |
| 03-07-99 | The VIRs Instrument performed Solar calibration at 04:39:42 and 09:14:00. |
| 03-06-99 | The CERES Instrument performed Solar calibration at 00:43:10z. The CERES Instrument also performed a special Internal calibration at 02:44:12z. |
| 03-04-99 | A 180 degree yaw maneuver was performed; the TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for 03-26-99.) |
| 02-21-99 | CERES is currently powered off and CERES personnel are developing a
plan for operating the instrument with the +15 V DAA anomaly. The FOT
proposal which describes the new method for leaving CERES powered on for
SunAcq/Safehold events is awaiting final review, approval, and testing. Plans are being arranged to power CERES on again in March (approximately the 3rd-5th) for a limited duration. |
| 02-14-99 | The CERES instrument is currently powered off, and will remain powered off while personnel develop a plan for the DAA anomaly. Plans are being arranged to power it on in March. |
| 02-04-99 | A 180 degree yaw maneuver was performed; the TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for 03-04-99.) |
| 01-22-99 | The CERES instrument was manually powered off at 02:53:40, and will remain powered off while personnel develop a plan for the DAA anomaly. |
| 01-19-99 | A 180 degree yaw maneuver was performed; the TRMM spacecraft is now
flying in the +X forward direction. (The next yaw maneuver is scheduled for
02-04-99.) The CERES instrument was powered on for 53 hours to gather science data in conjunction with the French SCARAB instrument on the RESURS-01 spacecraft at 21:14. |
| 01-07-99 | The Australian regions were re-enabled for the PR instrument until further notice; the weekly Wednesday calibration has been halted. |
| 01-06-99 | The LIS, PR, and TMI instruments were powered on and returned to Science mode. |
| 01-05-99 | The VIRS instrument was powered on and returned to Science mode. VIRS outgassing operations were successful. |
| 01-03-99 | The LIS, PR, TMI, and VIRS instruments were powered off due to ACS Sun
Acquisition mode; temperatures were monitored for out of limit violations.
CERES is currently powered off. Plans are being discussed for a possible power-on scenario which would occur in mid-January. |
| 1999 News | 1997 News | Top of page |
| 1998 |
| 12-19-98 | A 180 degree yaw maneuver was performed; the TRMM spacecraft is now flying in the -X forward direction. (The next yaw maneuver is scheduled for 01-19-99.) |
| 12-5-98 | A 180 degree yaw maneuver was performed; the TRMM spacecraft is now flying in the +X forward direction. (The next yaw maneuver is scheduled for 12-18-98.) |
| 12-2-98 | The PR instrument performed an internal calibration at 01:13:00. |
| 11-24-98 | The TRMM spacecraft has successfully completed its first year of continuous data-gathering. TRMM has produced continuous data since 12-08-97. |